Today is
Saturday,
September 23rd
2017

07-14-2009

Click on the thumbnails for fullsize image.

Back to the series list

The grouting finished around the fireplace. The grouting finished around the fireplace.

Closeup of the fireplace. Closeup of the fireplace.

The composite sink and Tuscan bronze fixtures I chose in the kitchen. The composite sink and Tuscan bronze fixtures I chose in the kitchen.

Closeup of the kitchen faucet. Closeup of the kitchen faucet.

The dishwasher. The dishwasher.

The microwave. The microwave.

The pedestal sink in the downstairs bathroom. The pedestal sink in the downstairs bathroom.

The guest bathroom. The guest bathroom.

The master bathroom. The master bathroom.

They also installed the AC compressors today...one for each level. They also installed the AC compressors today...one for each level.


Back to the series list